High Level Bridge
When this old and historically important bridge needed resurfacing with mastic asphalt, Radflex were called in to deal with two movement joints which ran the whole length of the bridge one on each side. As these joints were in non trafficked areas, our Radflex 125 was installed sandwiched in the mastic asphalt to give a solution which will last for many years to come.